Search Login Register Cart
Harbor

Fire by Design 30" Legacy Round White Finish Fire / Water Bowl d30.7 Item Number OPT-LUC31E12V-NGY-LP UPC Code h36 5 Installation Type Post GD869KT Size:43” Pan Kit

USD556.14 USD601.14

SKU 13114871725 · ★ 4.8

Fire by Design 30" Legacy Round White Finish Fire / Water Bowl d30.7 Item Number OPT-LUC31E12V-NGY-LP UPC Code h36 5 Installation Type Post GD869KT Size:43” Pan Kit

USD556.14 USD601.14

SKU 13114871725 · ★ 4.8

Pay in 4 interest-free payments of $139.03 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Oct 22 - Oct 27

Harbor notes

Description

Fire by Design 30" Legacy Round White Finish Fire Water Bowl d30.7 Item Number OPT LUC31E12V NGY LP UPC Code h36 5 Installation Type Post GD869KT Size:43” Pan Kit Item Number OPT LUC31E12V NGY LP UPC Code 196111420056 Manufacturer The Outdoor Plus Brand Name The Outdoor Plus Material GFRC Concrete Collection Round Lucia Finish Natural Gray Shape Round Fuel Type Liquid Propane Ignition 12V Electronic Ignition Hides Propane Tank No Burner Material 304 Stainless Steel Burning Area 20" Diameter Product Category Fire Pit Diameter 30" Height 20" Documents & Files transforming your outdoor space into a cozy retreat

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

Frequently Asked Questions for Fire by Design 30" Legacy Round White Finish Fire / Water Bowl d30.7 Item Number OPT-LUC31E12V-NGY-LP UPC Code h36 5 Installation Type Post GD869KT Size:43” Pan Kit

What should I check if I cannot find an order confirmation?

Check filtered message folders when confirmation is expected by email. A payment notification can provide context but may not explain the complete order status.

How can I ask about an order if I cannot access my account?

Ask what information is needed to verify the original transaction. Check the outcome of each documented step before repeating it.

What should I check before accepting a suggested substitute?

Ask whether the original option remains available under a different arrangement. Accept the substitute only after its confirmed details fit your needs and the revised arrangement is clear.

Discover

Kyanite finds

You may also like

Harbor reviews

Recommended

recommand products